Services

We deploy, integrate, and operate Preventos Hero alongside your team

Hero is a software platform — but a sewer-network rollout is rarely a software-only project. Preventos provides the consulting, field instrumentation, and operational support that turn a Hero deployment into measurable network outcomes.

The same three-step framing that defines Hero as a product also defines how we engage with your team. We don't drop in software and leave. We sit alongside your engineers, operators, and asset managers from first integration through ongoing operations.

  1. 1. Integrate

    We bring the data in

    We connect IoT loggers, SCADA, NIS, and weather feeds to your Hero environment, install field instrumentation where measurements are missing, and remediate data-quality issues at the source rather than papering over them downstream.

    • Field IoT logger installation and commissioning
    • SCADA & NIS integration via API
    • Weather-feed wiring from national meteorological services
    • First-pass data-quality audit and remediation
  2. 2. Analyse

    We make the numbers defensible

    We configure the I/I metric catalogue for your network, calibrate against historical and weather data, and sit with your engineering team to interpret what the dashboard is telling you about catchment behaviour.

    • I/I metric configuration per catchment
    • Weather-correction calibration
    • Per-site data-quality scoring setup
    • Joint interpretation workshops with your engineers
  3. 3. Act

    We turn analytics into operations

    We run the recurring reporting cadence, scope follow-up campaigns where the dashboard says they're needed (CCTV, smoke testing, IoT surveys), and document outcomes in a form your asset committee and regulator will accept.

    • Monthly / quarterly reporting cycles
    • Follow-up campaign scoping (CCTV, smoke testing, IoT surveys)
    • Asset-committee & regulator-ready documentation
    • Operational handover and ongoing support

Three service lines, one platform

Two analytics service lines for the network sides we know best — sewer and water-supply — and one operational service line that keeps the deployment running. All three are built around Hero.

Sewer-network analytics

I/I detection, hydraulics, leak investigation

For wastewater and stormwater networks. Catchment-level analysis, year-on-year comparisons, gravity-sewer leak campaigns, and real-time hydraulic monitoring on a single platform.

  • Infiltration & inflow detection at catchment level
  • Year-on-year comparison with weather correction
  • Gravity-sewer leak investigation campaigns
  • Real-time hydraulic monitoring of pumping stations and overflows
  • Sewer-overflow and flood-alarm services
Water-network analytics

Pressure, transients, flow, water quality

For potable water supply and distribution networks. Pressure transients on ageing networks, distribution-flow monitoring, and water-quality parameter analysis — same Hero environment, different domain.

  • Pressure and pressure-transients measurement
  • Distribution-network flow monitoring
  • Water-quality parameter monitoring
  • Leak-detection support for water-supply networks
  • Operational data analysis and reporting
Deployment & operations

Field IoT, integration, training, support

The operational layer that wraps the analytics. Everything from installing the first logger in a manhole to running the recurring data-quality review three years later.

  • Field IoT logger installation and ongoing operation
  • System integration (SCADA, NIS, weather APIs)
  • Data-quality remediation and ongoing curation
  • Customer training — engineers, operators, asset managers
  • Ongoing support and account management

How a deployment unfolds

From kickoff to first defensible numbers — typically 8–12 weeks. A first Hero deployment is a focused, time-boxed engagement. The five steps below are what most utility rollouts look like, with timing that depends on the size of your network and the state of your existing data sources.

  1. Week 1

    Discovery

    Workshop with your team — network shape, current data sources, priority questions.

  2. Weeks 2–5

    Integration

    Connect existing data sources, install field IoT where needed, validate first measurements.

  3. Weeks 4–7

    Configuration

    Stand up Hero environment, configure I/I metrics, calibrate against historical & weather data.

  4. Weeks 8–10

    Handover

    Training for your team. First reporting cycle delivered jointly. Defensible numbers in hand.

  5. From week 10

    Ongoing

    Operations support, follow-up campaigns, reporting cadence, recurring data-quality reviews.

Talk to us

Tell us about your network — we'll tell you what we'd do first

The fastest way to find out whether a Hero deployment makes sense for your utility is a 30-minute call. We'll walk through your current data sources, priority questions, and what a first engagement would look like.

Common starting points:

  • Catchment-level I/I analytics for a wastewater network already partly instrumented
  • Stormwater monitoring for a flood-risk catchment with existing telemetry gaps
  • Pressure-transient analysis for an ageing water-supply distribution network
  • A scoped pilot of the asset-management optimization module
Book a 30-minute call